Login | Register
產(chǎn)品中心
Home > Products > Screw pumps > Long lead screw pump
view  
 
A Long Lead Screw Pump is a high-performance positive displacement pump designed for the precise and efficient transfer of viscous, abrasive, and shear-sensitive fluids in demanding industrial applications. Featuring an extended lead screw and rotor-stator mechanism, this pump provides continuous, low-pulsation flow while handling large volumes with minimal energy consumption. Its long lead design ensures smooth and stable operation, making it ideal for industries such as chemical processing, food and beverage, pharmaceuticals, oil and gas, and wastewater treatment. The Long Lead Screw Pump excels at pumping high-viscosity liquids, pastes, and slurries, including oils, resins, adhesives, syrups, and sludge, without causing shear damage or compromising product quality. Constructed from durable, corrosion-resistant materials, it offers excellent wear resistance, long service life, and reliable performance even under harsh conditions. The pump’s robust yet compact design allows for easy installation, maintenance, and integration into automated production systems, reducing downtime and operational costs. With strong suction capabilities, high efficiency, and energy-saving performance, the Long Lead Screw Pump is suitable for continuous, precise, and hygienic fluid transfer, providing a versatile and dependable solution for modern industrial processes requiring consistent flow, accuracy, and durability.
  • Long lead screw pump

    Long lead screw pump

    The Long Lead Screw Pump is a specialized positive displacement pump designed for efficient transfer of highly viscous, abrasive, and particulate-laden fluids. Distinguished by its extended lead rotor, this pump delivers steady, non-pulsating flow over long distances and is ideal for applications requiring consistent metering, high pressure, or precise dosing.

    Send Inquiry

This website uses cookies to ensure you get the best experience on our website.

Accept Reject
蒙山县| 长泰县| 安福县| 武冈市| 隆德县| 万宁市| 聂荣县| 原平市| 水城县| 辉南县| 祁门县| 德阳市| 大埔区| 元朗区| 桑植县| 江华| 博湖县| 沙洋县| 景德镇市| 黄山市| 阳谷县| 丰原市| 博乐市| 东兴市| 上高县| 弋阳县| 乌兰县| 湟源县| 镇宁| 蓝田县| 锡林浩特市| 临颍县| 合川市| 阜城县| 卢湾区| 沂南县| 敖汉旗| 扶沟县| 垫江县| 儋州市| 遂川县|